Shopping Cart

Your cart is empty.

Your cart is empty.

PUPTECK Outdoor Dog Run Cable for Small to Large Dogs up to 125lbs, Heavy Duty Tie Out Cable Trolley System with Runner Pulley Cable Zip Line for Yard, Camping, Long Lead Chain Leash

Free shipping on orders over $29.99

$29.99

$ 14 .99 $14.99

In Stock

1.:100 Ft


2.Color:Reflective Silver


About this item

  • HAPPY RUNNING TROLLEY SYSTEM: Equipped with a 100ft dog tie-out cable and a 10ft runner cable, which gives your dog freedom and mobility. Both are steel durable cable with vinyl-coated to protect against corrosion, help the pulley run smoothly along the cable, durable and long-lasting for dogs running crazy whether used in rain, sun, snow, or wind weather
  • SUPER LONG, STRONG ENOUGH: This tie-out cable for dogs is strength tested for Dogs up to 125 pounds. 100 ft tie-out cable designed especially to give more space for large dogs to move around freely. Your puppy will promote healthy exercise without feeling a sense of nooses because the lead is like an invisible fence and makes your dog feel less strained
  • SHOCK-ABSORBING BUFFER SPRING: Our dog trolley system’s spring is located on the 100ft Cable, reducing tension and absorbing the shock of quick movement to a greater extent when tugging, releasing the impact force to the outside, keeping your puppy feel ease and secure while reducing the frequent pulling and wear of the rope and increasing its service life
  • NO TANGLE, KEEP SAFE: Compared to a typical dog tie-out, the Trolley System with 360° tangle free swivel can effectively avoid the bushes or other obstacles on the ground, let your dog run safely without tangling. The red design can provide visibility protection during the day. Let you quickly confirm the dog's position. Free your hand, without the fear of them running off when camping
  • EASY TO INSTALL: Our dog trolley system comes with all components needed for easy set up with detailed Installation Instructions, if you have any concerns or dissatisfaction for any reason just feel free to contact us, and we will help you to solve your problem within 24 hours



Product Description

1
1

Every dog loves to run around, but you always worry about your pet will bolt into the woods or street.

So why not have a try on this amazing Dog Run Cable, it will gives her/him a ton of area to run wildly without any worry.

1

Slides smoothly across the tie out cable without getting stuck, following your dog as he explores.

1

Reducing tension and absorbing the shock of quick movement to a greater extent when tugging

1

Easy to attach to a dog collar or harness, tangle free without tangling and rust-proof.

1

Made by high quality and durable rust-resistant material, durable and strong enough to stand up to constant activity.

1

This runner is sturdy with how well its holding up to every dog constant running and pulling when she tries to go further than it allows her.

1

INSTALLATION INSTRUCTION

1 Installation height should be 7-8 inches or higher above the ground.
2 Screw the hooks into stationary objects.
3 Attach the shock absorber spring end of the trolley to one of the hooks.
4 Slide one of the protective stoppers onto the cable and let it slide loosely.
5 Slide the pulley onto the cable.
6 Slide the second protective stoppers onto the cable and let it slide loosely.
7 Loop the end of the cable tight, secure the large clamp. Tighten the clamps.
8 Any excess cable can be cut off.
9 Select the optional location for the stops. Place a small clamp behind each stop.
10 Attach one end of the lead line to the pulley and the other end to the dog's collar. Your dog will now enjoy the freedom of the PUPTECK Reflective Dog Run Cable, run happily outside!
NOTICE 1 Ensure installation is secure, check the condition of your dog's collar for any weak spots that could tear. It is not advisable to use worn-out collars with this product.
NOTICE 2 It is for dog up to 125 lbs. Aggressive or vicious dogs should not be left unsupervised. Inspect all parts periodically for excessive or damage. Do not allow cable to become kinked.
NOTICE 3 Dog trolley system should be installed high enough above ground so that people will not walk into cable.
SERVICE *If you have any questions after receiving the product, please do not worry. Leave us a message and we will reply to you within 24 hours, providing you with satisfactory solutions.

PUPTECK Dog Runner for Yard

    • Product Include

      40ft Dog Tie Out Cable & 16" Stake for dogs up to 125lbs

    • Product Include

      100 ft Heavy Duty Tie Out Cable with 10 Ft Runner for dogs up to 125lbs

    • Product Include

      100 ft Heavy Duty Tie Out Cable with 10 Ft Runner for dogs up to 125lbs

    • Durable and Rust-proof

      Rain and rust resistant, can be used in rain, sun, snow and wind.

    • Suitable for Multi place

      In the Park/In the Yard/Camping.

    • Let your dog roam outside

      Connact with dog collar or harness, we offer multi collars and harness in shop.


Jason Brasel
Reviewed in the United States on September 2, 2024
We’ve had this set up in our back yard for a couple of years. In that time I’ve had to replace the spring with something a little more durable. Then this morning we saw the dog in the front yard making a beeline for the busy road we live on. Fortunately we were able to get a hold of him. Looks like the plastic cover wore through and the cable rusted through.
James Payne
Reviewed in the United States on September 15, 2024
Put this up between two trees approximately 94 feet apart. Our 62 lb dog runs on it daily and we haven't had any trouble with it. Easy to install. One small thing is the picture shows a ring to connect at the end opposite of the spring end, and that wasn't included so don't know if the picture is wrong or if it was missing. Not a big deal, I just made a loop out of the cable to connect with the cable lock. Instructions say hang between 7-8 feet high, I installed exactly 7 feet to provide extra length on the leader leash. Although I have it as tight as I could get it, there is a little droop in the middle. If I had to do over would probably hang it 7 1/2 feet high to ensure extra clearance. One other thing I did to pull it tighter is after it was up, I went back to each end and slid a long screwdriver through hooks and tightened screws into tree even more which helped. Seems to be decent quality, so far so good.
Russ Meskis
Reviewed in the United States on June 1, 2024
Good system, easy to install, and cost effective. My only complaint/issue is the trolley system. It does roll smooth and is one of the better operating ones our there. HOWEVER, the pin going through the trolley wheel is garbage. Within 2 weeks it busted and fell out. Easy enough to fix with a simple machine screw and nut but it would be much better if the pulley wheel had a bearing so as to reduce wear and breakage of the pin.
Brandy Vandegrift
Reviewed in the United States on May 13, 2024
We have a high energy doodle that needed a safe place to run when we aren’t able to give him our full attention. This run has been perfect and has held up to his large size and energy.
Kayla
Reviewed in the United States on August 25, 2023
We wanted something to let our old boy come outside and run around or relax. It is a little hard to pull it taut, we tied one end around the hitch on our tractor lol. The dog loves it and it has given him lots of freedom. The leash part is 10ft, the only regret is that I wish we would have put one end a little higher so he didn't get tangled so much, other than that we love it.
Jeremy Sharrock
Reviewed in the United States on June 12, 2020
Awesome product. We've got a 75lb very hyper and strong dog. The box was not missing any parts and its very easy to assemble. I have a wood exterior house which I installed one end into and screwed the other end into a tree in the yard. The cables are sturdy and of great quality. One thing I would've done differently and still need to do, is set the cable higher than you would expect. Because of the distance it stretches across the yard and the weight of the cable, it does droop or sag a bit. Because there's a 10ft cable that attaches to the cable and the dogs collar, it sort of drags a bit on the ground and can get in his way when running. I'd rather have the cable more taught and lead him above him. Anyway, the dog absolutely loves it and we love it because to let him out in the non-fenced in yard in the winter means we can hook him right at the door without having to go outside.
Customer
Reviewed in the United States on January 25, 2020
Several other reviews state that the pulley gets stuck immediately or soon after installation. Well, this happened to me but I figured out it was due to improper installation. The instructions DON'T specify this (unfortunately) but if you run the cable through the top opening of the pulley, it will definitely get stuck. So, run the cable through the lower opening of the pulley (the side the dog leash attaches to) and it works smoothly. We've had ours up for a couple of weeks now and there have been no problems.Installing the cable takes two people - one to pull the cable tight and the other to tighten the clamp.The construction of the cable and hardware is solid - very durable.The seller of this product is getting bad reviews because they didn't take the time to write clearer instructions - communication is everything....Other than the poorly written installation instructions, this is a great product that I highly recommend.
Jonathan K. Read
Reviewed in the United States on October 1, 2019
I will be looking into a refund most likely or will have to dramatically alter this product to make it usable.I had read many reviews of different products and saw some concerning reviews regarding the pulley getting locked up, but it also had a majority positive reviews. Some of the other products I looked at were 100 dollars and had similar negative reviews so I thought I'd take a chance on the cheaper one rather than waste more money.Big mistake.This product does not work and I contend that the positive reviews either never installed this product or were astroturfed and generated by employees.I installed the product between two trees and went to move the pulley to the other tree to gauge where I wanted the stop. YANK. I tried to work the pulley by hand along the line. It only moves when held directly down and gently moved along the line.In other words it only works (slightly) in a way that no dog will ever use the run. If tilts at all, as a dog would cause it to do) or moves fast at all it completely binds up.Literally the product does not work. This is not a kink or a bad cable, I move the pulley around and at any point on the line it binds up when moved as a dog would. I tried hooking the dog up to make sure, and yep, YANK, won't move.It is actually infuriating that they would even sell this product which fails to work out of the box.
Recommended Products

$14.13

$ 6 .99 $6.99

4.8
Select Option